Jeep Cherokee XJ 8'' Critical Path Long Arm Yükseltme Kiti
Stok Kodu : 12077
Kargo : Alıcı Ödemeli (Anlaşmalı Kargo)
Marka : Iron Rock
% 100 indirim
0,00
Kazancınız

BANKA HAVALESİ İLE ÖDEME YAPTIĞINIZDA ANINDA %2 İNDİRİM

ÜRÜN TÜKENDİ!
Stok Yok
Stoğa girince haber ver
Ürün Detayları
DOETSCH TECH AMORTİSÖR UPGRADE
Want to run 35" tires* on your Cherokee and score 1100+ on the RTI? We have put together the most aggressive and capable 8" kit anywhere at a price that can't be beat!!Keeping your tires on the ground is a key component to excellent traction. Disconnect your front sway bar and the long arm system will provide more articulationthan you thought possible! This means in the most difficultterrain, this suspension will keep you moving forward. 

FRONT END
  • Abuse this lift on the trail with confidence. 2" x 5/16" wall DOM make up the long arms so you know they are strong.
  • These long arms also featurean inboard directed bend that allow you to clear 37" tires at full lock steering without rubbing on the control arms! Thismeans you will retain the tight, nimble steering your XJhas always offered you.
  • Included is our unique caster adjuster bracket will allow you to perfectly set your casterafter installation. It gives 7.5 degrees of adjustability,which is more than enough even if you intend on going taller later on!
  • The long arms are the ideal length for the 4.5-8" of lift, perfectly centering your axle and tires on compression.
  • You'll get as much travel as your shocks will allow (DT8000 shocks willafford you the longest travel for this lift).
  • The double shear track bar conversion gets you several upgrades in one! First, it is made from 1.25" solid cold rolled steel so strengthis not a concern. Second, it is longer than the factory barand others that mount in the factory location giving you better suspension geometry and less bump steer. Third, the frame side bracket lowers the mounting point by about 3/4" giving you an even better track bar angle. Finally, the ball joint style mount is eliminated and replaced with astronger set up that allows infinitely more articulationthan the ball joint (or more simply put, it will not limit yoursuspension from flexing out).
SUBFRAME
  • Keep your belly high with the highest clearance Cherokeesubframe available!
  • All 1/4" steel construction. All the subframe parts are laser cut and precision CNC brake formed.
  • Three piece design. This allows you to remove the centersection so that you can work on/remove your transfer caseand transmission without having to mess with your suspension! That's right, your long arms stay bolted securely in place while the center crossmember is removed.
  • We have included a built in 1" drop option that gives youthe choice to easily drop your t-case for better driveshaft angles.This option is standard and is not required for those who have, or will install,a slip yoke eliminator (A SLIP YOKE ELIMINATOR IS REQUIRED FOR THIS LIFT HEIGHT). Either way, you have the option to use the drop or not at no extra charge!
  • Each frame mount covers a lot more surface area than the factory crossmember, spreading the stress of the drivetrain and suspension over a much larger uni-frame surface area.
  • It is bolt in! This makes it simple to install foranybody with basic hand tools. For those of you who prefera weld in kit, the subframe parts are also great to weld in place for even better strength.
REAR END
  • 5.5" ultra premium leaf spring packs featuring: militarywrapped Berlin eye ends, 6 thin leaf design, tapered endswith Teflon anti-friction pads.
  • 1" HD Add-a-Leaf
  • 1.5" heavy duty lift shackle not only gives you the additional inch of lift, but also improved suspension articulation in therear of your XJ.
*Note: Running 35" tires will require minor fender trimming.

KIT INCLUDES:
  • 3 Piece High Clearance HD Subframe Assembly
  • Front Long Arms with 7.5° Caster Adjuster
  • 8" Coil Springs
  • 5.5" Leaf Springs
  • 1" Lift Add a Leaf
  • 1.5" Lift Shackle
  • Hydro 8000 Shocks
  • HD Track Bar with Double Shear Frame Mounting Bracket
  • Extended Length Stainless Steel Brake Hoses
  • Extended Length Front Sway Bar Links
  • Drop Pitman Arm
  • U-Bolts
  • All necessary hardware
Taksit Seçenekleri
Yorumlar
YORUMLARSize Yorumunuzu Yazın

Bu Ürünü Nasıl Buldunuz ?

YORUMLARA GÖZ ATIN
Yorum bulunmamaktadır
BENZER ÜRÜNLER
Nissan Terrano/Pathfinder Yükseltme Kiti 40 mm
% 22
indirim
59.039,96
46.124,97
Hilux Revo Foam Cell EKO Konfor Yükseltme Kiti
% 22
indirim
83.921,09
65.563,35
RANGER T9 AĞIR HİZMET ÜST SALINCAK TAKIMI
% 22
indirim
13.540,71
10.578,68
Toyota Hilux Vigo Revo Ağır Hizmet Üst Salıncak Takımı
% 22
indirim
12.694,31
9.917,43
Jeep Grand Cherokee WJ Yükseltme Kiti
% 22
indirim
65.795,82
51.402,99
Mitsubishi L200 2020+ Alüminyum Kupa Yükseltme Seti 5 CM
% 22
indirim
11.895,18
9.293,11
Ranger Alüminyum Kupa Yükseltme Seti 5 CM T6 T7 T8
% 22
indirim
11.895,18
9.293,11
ARKA HELEZON YÜKSELTME GET SET (2INCH) DEFENDER
% 22
indirim
2.928,05
2.287,54
ÖN HELEZON YÜKSELTME GET SETİ (2INCH) DEF.D.S1-R.R
% 22
indirim
3.294,05
2.573,48
Toyota Hilux Revo Profesyonel Full Yükseltme Kiti
% 22
indirim
157.692,37
123.197,16
Suzuki Grand Vitara 2005-2015 Yükseltme Kiti
% 22
indirim
57.080,68
44.594,28
Nissan Pathfinder R51 Yükseltme Kiti Ironman 4x4
% 22
indirim
57.897,96
45.232,78
Land Cruiser VX80 6 inch Yükseltme Kiti
% 22
indirim
260.841,93
203.782,76
Land Cruiser 100 VX100 Foam Cell PRO Yükseltme Kiti
% 22
indirim
108.827,52
85.021,50
Lada Niva Yükseltme Kiti
% 22
indirim
23.830,22
18.617,36


Bu Sanal Mağazada Elektronik Ticaret için ProjeSoft E-Ticaret yazılımı kullanılmaktadır.