Jeep Cherokee XJ 8'' Critical Path Long Arm Yükseltme Kiti
Stok Kodu : 12077
Kargo : Alıcı Ödemeli (Anlaşmalı Kargo)
Marka : Iron Rock
% 17 indirim
40.695,34
33.912,78
Kazancınız
ÜRÜN TÜKENDİ!
Stok Yok
Not : Ürünümüzün Stoğu Tükenmiştir Stoğa Geldiğinde Haberdar Olmak İçin 'Stoğa Eklendiğinde Haber Ver' Seçeneğini Kullanabilirsiniz
Stoğa girince haber ver
Ürün Detayları
DOETSCH TECH AMORTİSÖR UPGRADE
Want to run 35" tires* on your Cherokee and score 1100+ on the RTI? We have put together the most aggressive and capable 8" kit anywhere at a price that can't be beat!!Keeping your tires on the ground is a key component to excellent traction. Disconnect your front sway bar and the long arm system will provide more articulationthan you thought possible! This means in the most difficultterrain, this suspension will keep you moving forward. 

FRONT END
  • Abuse this lift on the trail with confidence. 2" x 5/16" wall DOM make up the long arms so you know they are strong.
  • These long arms also featurean inboard directed bend that allow you to clear 37" tires at full lock steering without rubbing on the control arms! Thismeans you will retain the tight, nimble steering your XJhas always offered you.
  • Included is our unique caster adjuster bracket will allow you to perfectly set your casterafter installation. It gives 7.5 degrees of adjustability,which is more than enough even if you intend on going taller later on!
  • The long arms are the ideal length for the 4.5-8" of lift, perfectly centering your axle and tires on compression.
  • You'll get as much travel as your shocks will allow (DT8000 shocks willafford you the longest travel for this lift).
  • The double shear track bar conversion gets you several upgrades in one! First, it is made from 1.25" solid cold rolled steel so strengthis not a concern. Second, it is longer than the factory barand others that mount in the factory location giving you better suspension geometry and less bump steer. Third, the frame side bracket lowers the mounting point by about 3/4" giving you an even better track bar angle. Finally, the ball joint style mount is eliminated and replaced with astronger set up that allows infinitely more articulationthan the ball joint (or more simply put, it will not limit yoursuspension from flexing out).
SUBFRAME
  • Keep your belly high with the highest clearance Cherokeesubframe available!
  • All 1/4" steel construction. All the subframe parts are laser cut and precision CNC brake formed.
  • Three piece design. This allows you to remove the centersection so that you can work on/remove your transfer caseand transmission without having to mess with your suspension! That's right, your long arms stay bolted securely in place while the center crossmember is removed.
  • We have included a built in 1" drop option that gives youthe choice to easily drop your t-case for better driveshaft angles.This option is standard and is not required for those who have, or will install,a slip yoke eliminator (A SLIP YOKE ELIMINATOR IS REQUIRED FOR THIS LIFT HEIGHT). Either way, you have the option to use the drop or not at no extra charge!
  • Each frame mount covers a lot more surface area than the factory crossmember, spreading the stress of the drivetrain and suspension over a much larger uni-frame surface area.
  • It is bolt in! This makes it simple to install foranybody with basic hand tools. For those of you who prefera weld in kit, the subframe parts are also great to weld in place for even better strength.
REAR END
  • 5.5" ultra premium leaf spring packs featuring: militarywrapped Berlin eye ends, 6 thin leaf design, tapered endswith Teflon anti-friction pads.
  • 1" HD Add-a-Leaf
  • 1.5" heavy duty lift shackle not only gives you the additional inch of lift, but also improved suspension articulation in therear of your XJ.
*Note: Running 35" tires will require minor fender trimming.

KIT INCLUDES:
  • 3 Piece High Clearance HD Subframe Assembly
  • Front Long Arms with 7.5° Caster Adjuster
  • 8" Coil Springs
  • 5.5" Leaf Springs
  • 1" Lift Add a Leaf
  • 1.5" Lift Shackle
  • Hydro 8000 Shocks
  • HD Track Bar with Double Shear Frame Mounting Bracket
  • Extended Length Stainless Steel Brake Hoses
  • Extended Length Front Sway Bar Links
  • Drop Pitman Arm
  • U-Bolts
  • All necessary hardware
Taksit Seçenekleri
TAKSİT TUTAR TOPLAM TUTAR
2 3 4 5 6 7 8 9 10 11 12
18303.53 TL 36607 TL
12440.04 TL 37320 TL
9541.07 TL 38164 TL
7796.04 TL 38980 TL
6630.84 TL 39785 TL
5820.84 TL 40746 TL
5210.94 TL 41687 TL
4739.14 TL 42652 TL
4373.02 TL 43730 TL
4076.4 TL 44840 TL
3827.28 TL 45927 TL
TAKSİT TUTAR TOPLAM TUTAR
2 3 4 5 6 7 8 9 10 11 12
18370.95 TL 36742 TL
12588.26 TL 37765 TL
9765.26 TL 39061 TL
8034.3 TL 40171 TL
6911.38 TL 41468 TL
6117.02 TL 42819 TL
5543.48 TL 44348 TL
5101.66 TL 45915 TL
4733.12 TL 47331 TL
4453.89 TL 48993 TL
4207.96 TL 50496 TL
TAKSİT TUTAR TOPLAM TUTAR
2 3 4 5 6 7 8 9 10 11 12
18303.53 TL 36607 TL
12446.88 TL 37341 TL
9548.59 TL 38194 TL
7802.32 TL 39012 TL
6637.07 TL 39822 TL
5826.44 TL 40785 TL
5216.07 TL 41729 TL
4743.91 TL 42695 TL
4377.54 TL 43775 TL
4080.71 TL 44888 TL
3830.91 TL 45971 TL
TAKSİT TUTAR TOPLAM TUTAR
2 3 4 5 6 7 8 9 10 11 12
18311.44 TL 36623 TL
12456.48 TL 37369 TL
9560.44 TL 38242 TL
7814.9 TL 39075 TL
6651.91 TL 39911 TL
5842.6 TL 40898 TL
5231.52 TL 41852 TL
4760.09 TL 42841 TL
4393.99 TL 43940 TL
4098.07 TL 45079 TL
3849.7 TL 46196 TL
TAKSİT TUTAR TOPLAM TUTAR
2 3 4 5 6 7 8 9 10 11 12
18466.99 TL 36934 TL
12571.46 TL 37714 TL
9816.13 TL 39265 TL
8040.01 TL 40200 TL
6863.55 TL 41181 TL
6042.26 TL 42296 TL
5425 TL 43400 TL
4948.24 TL 44534 TL
4490.57 TL 44906 TL
4190.54 TL 46096 TL
3937.67 TL 47252 TL
TAKSİT TUTAR TOPLAM TUTAR
2 3 4 5 6 7 8 9 10 11 12
18303.53 TL 36607 TL
12446.88 TL 37341 TL
9548.59 TL 38194 TL
7802.32 TL 39012 TL
6637.07 TL 39822 TL
5826.44 TL 40785 TL
5216.07 TL 41729 TL
4743.91 TL 42695 TL
4377.54 TL 43775 TL
4080.71 TL 44888 TL
3830.91 TL 45971 TL
TAKSİT TUTAR TOPLAM TUTAR
2 3 4 5 6 7 8 9 10 11 12
18201.36 TL 36403 TL
12344.94 TL 37035 TL
9449.62 TL 37798 TL
7698.7 TL 38494 TL
6531.23 TL 39187 TL
5720.49 TL 40043 TL
5104.89 TL 40839 TL
4629.67 TL 41667 TL
4255.59 TL 42556 TL
3952.54 TL 43478 TL
3699.52 TL 44394 TL
TAKSİT TUTAR TOPLAM TUTAR
2 3 4 5 6 7 8 9 10 11 12
18305.51 TL 36611 TL
12446.88 TL 37341 TL
9548.59 TL 38194 TL
7803.22 TL 39016 TL
6637.85 TL 39827 TL
5827.14 TL 40790 TL
5216.71 TL 41734 TL
4744.51 TL 42701 TL
4377.54 TL 43775 TL
4080.71 TL 44888 TL
3830.91 TL 45971 TL
TAKSİT TUTAR TOPLAM TUTAR
2 3 4 5 6 7 8 9 10 11 12
18442.89 TL 36886 TL
12543.56 TL 37631 TL
9621.19 TL 38485 TL
7858.37 TL 39292 TL
6681 TL 40086 TL
5827.14 TL 40790 TL
5216.07 TL 41729 TL
4743.91 TL 42695 TL
4377.54 TL 43775 TL
4080.71 TL 44888 TL
3830.91 TL 45971 TL
Yorumlar
YORUMLARSize Yorumunuzu Yazın

Bu Ürünü Nasıl Buldunuz ?

YORUMLARA GÖZ ATIN
Yorum bulunmamaktadır
BENZER ÜRÜNLER
SsangYong Musso Grand Suspansiyon Yükseltme Kiti ( Makaslı)
% 17
indirim
97.393,48
81.161,24
JEEP GRAND CHEROKEE WH GET 5 CM YÜKSELTME TAKOZU
% 17
indirim
7.198,80
5.999,00
L200 Foam Cell EKO Yükseltme Kiti 2019+
% 17
indirim
78.146,68
65.122,23
Nissan Pathfinder R50 Suspansiyon Yükseltme Kiti
% 17
indirim
27.362,93
22.802,44
Ford Ranger Amarok EKO Suspansiyon Yükseltme Kiti
% 17
indirim
69.103,00
57.585,83
Dodge Nitro 2007-2012 GET YÜKSELTME KİTİ 5 CM
% 17
indirim
3.108,00
2.590,00
Ironman 4x4 Jeep Cherokee XJ EKO Suspansiyon Yükseltme Kiti
% 17
indirim
38.029,84
31.691,53
Navara D22 Torsiyonlu Yükseltme Kiti
% 17
indirim
64.928,99
54.107,49
Ford Ranger 2011-2019 Foam Cell Pro Yükseltme Kiti
% 17
indirim
150.728,01
125.606,68
Ford Ranger 2011-2019 FoamCell PRO EKO Yükseltme Kiti
% 17
indirim
102.031,27
85.026,06
Ford Ranger 2011-2019 Yükseltme Kiti
% 17
indirim
101.567,49
84.639,58
Mercedes X-Class PRO Suspansiyon Yükseltme Kiti
% 17
indirim
110.843,06
92.369,22
Nissan Navara NP300 PRO FULL Yükseltme Kiti
% 17
indirim
166.960,26
139.133,55
Ironman 4x4 Jeep Grand Cherokee ZJ Suspansiyon Yükseltme Kiti
% 17
indirim
52.870,75
44.058,96
Nissan Terrano/Pathfinder Yükseltme Kiti 40 mm
% 17
indirim
64.928,99
54.107,49


Bu Sanal Mağazada Elektronik Ticaret için ProjeSoft E-Ticaret yazılımı kullanılmaktadır.